Orinda Oaks Wetland Mitigation Project
2 Documents in Project
Summary
SCH Number
2004092117
Lead Agency
City of Orinda
Document Title
Orinda Oaks Wetland Mitigation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/9/2012
Present Land Use
Residential Single Family Low Density (1-2 units/ac)
Document Description
The project is limited to creation of a 4,500-square-foot (0.10-acre) seasonal wetland. The wetland will be created by recontouring the existing channel to form a gradually sloping basin, installing berms or other retention features within the basin to slow water flows, and re-seeding the basin and adjacent banks with herbaceous wetland species currently found onsite. Creation of wetland will require the removal of one coast live oak. The project is located at San Pablo Creek, south of Stein Way between Knickerbocker Lane and Oak Road in the City of Orinda, County of Contra Costa. The California Department of Fish and Game is executing Lake and Streambed Alteration Agreement Number 1600-2012-0110-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Signature Development Group, Inc.
Contact Information
Name
Randi Adair
Agency Name
Calfiornia Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Orinda
Counties
Contra Costa
Cross Streets
Stein Way / Knickerbocker Lane
Zip
94563
Total Acres
23
State Highways
24
Railways
N/A
Airports
N/A
Schools
Orinda Intermediate and Miramonte High
Waterways
N/A
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA