Sacramento River Mile 154.5R Bank Protection Maintenance for 2004

3 Documents in Project

Summary

SCH Number
2004092110
Lead Agency
California Department of Water Resources (DWR)
Document Title
Sacramento River Mile 154.5R Bank Protection Maintenance for 2004
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2005
Document Description
The project will place fill material into four eroded scours totaling 160 linear feet in the Sacramento River channel for flood project maintenance, in order to restore pre-existing bank contours and stabilize the site against further erosion during flooding events. Only bank located above the ordinary high water mark will be restored, so there will be no in-water work for this maintenance project. Although the work will occur directly adjacent to mature blue elderberry bushes which are habitat for the Federally-listed valley elderberry longhorn beetle, the bushes will be completely avoided and not adversely impacted. All areas where grading or fill activities scarify the soil will be stabilized with standard erosion control practices, including revegetation. There will be no significant environmental impacts associated with this project due to the incorporation of mitigation measures.

Contact Information

Name
Duane Cornett
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Colusa
Counties
Colusa
Cross Streets
State Hwy 45 and Reservation Road
Total Acres
0.2
State Highways
45
Waterways
Sacramento River
Township
17N
Range
2E
Section
25
Base
MDBM

Notice of Determination

Approving Agency
California Department of Water Resources
Approving Agency Role
Lead Agency

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print