Student Housing Project, Calfornia State University, Maritime Academy
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2004092076
- Lead Agency
- California State University Board of Trustees
- Document Title
- Student Housing Project, Calfornia State University, Maritime Academy
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/20/2007
- Present Land Use
- Master Plan Designation: Parking and Open Space GP: Community Parks Z: Public Facilities
- Document Description
- The project will construct 66 double-occupancy dormitory style student housing units arranged around the perimeter of a three-story building. The bathrooms are located in the central core of every floor, each serving two dormitory rooms, or four students. Additional support spaces distributed on each floor include a laundry room, common area for entertainment and social gathering, and a separate study room.
- Contact Information
-
Roger Jaeckel
California State University Board of Trustees
Lead/Public Agency
401 Golden Shore
Long Beach, CA 90802
Phone : (707) 654-1127
Location
- Cities
- Vallejo
- Counties
- Solano
- Cross Streets
- Faculty Drive / Maritime Academy Drive
- Zip
- 94590
- Total Acres
- 80
- State Highways
- 29, I-80
- Railways
- SPT Co.
- Airports
- none
- Schools
- California Maritime Academy
- Waterways
- Carquinez Strait, Mare Island Strait, San Francisco Bay, Napa River
Notice of Determination
- Approving Agency
- Trustees
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- California Maritime Academy, Office of Facilities Planning, 200 Maritime Academy Drive, Vallejo, CA 94590 and CSU Chancellor's Office, Capital Planning, Design and Construction, 401 Golden Shore, Long Beach, CA 90802-4210
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.