Rock Slough Project (Lake or Streambed Alteration Agreement No. 1600-2015-0035-R3)

27 Documents in Project

Summary

SCH Number
2004092011
Lead Agency
Oakley, City of (City of Oakley)
Document Title
Rock Slough Project (Lake or Streambed Alteration Agreement No. 1600-2015-0035-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Land and Streambed Alteration Agreement No. 1600-2015-0035-R3, pursuant to section 1602 of the Fish and Game Code to ACD-TI Oakley, LLC. A Delaware LLC., as represented by Perry Hariri. Project is associated with the 2,546 acre area zoned for the East Cypress Corridor. The Project is limited to the Rock Slough Bridge that will span Rock Slough and connect with Byron Highway to the south. The structure will be comprised of three spans of precast-pre-stressed concrete voided slab girders sitting on reinforced concrete two-column piers and seat-type abutments. The total length of the span will be approx. 220 feet and the width will be approx. 56 feet. The length of the bridge over the slough will be approx. 210 feet; a total of 12,320 sq. ft. of structure over Rock Slough will result from construction of the bridge. the height of the bridge will be a minimum of 10 feet above mean high water level.

Contact Information
Robert Stanley
CDFW
7329 Silverado Trail
Napa, CA 94588

707-944-5573

Location

Cities
Oakley
Counties
Contra Costa
Cross Streets
E. Cypress Road / Jersey Island Road
Parcel #
Numerous
State Highways
SR 4
Railways
ATSF
Waterways
San Joaquin River, Dutch Slough, Sand Mound Slough, Rock Slough, Contra Costa Canal
Township
2N
Range
3E
Section
21, 28
Other Information
Section: 27, 22

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94588

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA