Tijuana River Valley Regional Park Trails and Habitat Enhancement Project

10 Documents in Project

Summary

SCH Number
2004091159
Lead Agency
San Diego County
Document Title
Tijuana River Valley Regional Park Trails and Habitat Enhancement Project
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project would improve an existing unofficial path, which is a .75 mile segment out of 22 miles of proposed trails within the Tijuana River Valley River Park Trail System. The proposed trail will be located along an existing unimproved path, which ranges in width from two to eight feet. The proposed trail will have a tread width of six feet and is a multi-use, equestrian type trail, designed for use by pedestrians, equestrians and bikes. The new construction will adhere to topographical contours and grades minimized to follow existing topography with a maximum 5% slope for the entire trail.

Contact Information
Sem Jenniches
State Coastal Conservancy
1330 Broadway, 13th Floor
Oakland, CA 94612

510 286 4092

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Hollister and Monument Road
Total Acres
1,800
Parcel #
Numerous
State Highways
I-5 and I-805
Schools
Southwest High School
Waterways
Tijuana River, Pacific Ocean
Township
19S
Range
2W
Section
Imperi
Other Information
Section: Imperial Beach

Notice of Determination

Approving Agency
State Coastal Conservancy
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
County of San Diego Department of Public Works, 5489 Kearny Villa Road, Suite 305, San Diego CA 92123

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search