Injection of Gaseous Ozone for the Remediation of Groundwater at a Site Referred to as the 76 Station #6907

2 Documents in Project

Summary

SCH Number
2004091101
Lead Agency
Regional Water Quality Control Board, Region 4 (Los Angeles)
Document Title
Injection of Gaseous Ozone for the Remediation of Groundwater at a Site Referred to as the 76 Station #6907
Document Type
NOD - Notice of Determination
Received
Posted
12/27/2004
Document Description
Under the oversight of the Regional Board, ConocoPhillips proposes to install and operate a C-Sparge™ system to remediate the dissolved-phase petroleum hydrocarbon plume beneath the site. The C-Sparge™ technology combines low-flow (3 to 5 cubic feet per minute [cfm]) air sparging with ozonation to oxidize petroleum hydrocarbons into benign byproducts, carbon dioxide and water. Ozone is generated onsite using a control panel with built-in compressor and ozone generator. Using perforated sparge points, microbubbles (10 to 50 µm) of encapsulated ozone are introduced below the water table, where the oxidation reactions take place. Ten sparge points, integral to the C-Sparge™ system, will be used onsite within the dissolved-phase plume. Using a control panel with a built-in compressor and ozone generator, microbubbles of encapsulated ozone will be introduced into the subsurface through a given sparge point or points at flow rates ranging from 3 to 5 cfm. During sparging, no groundwater or vapors will be extracted. Sparging will be performed on cycled basis with each well cycled on for 5 to 10 minutes. Cycle times will be adjusted, as necessary, to optimize system efficiency.

Contact Information

Name
Orlando H. González
Agency Name
Regional Water Quality Control Board, Region 4 (Los Angeles)
Contact Types
Lead/Public Agency

Location

Cities
Whittier
Counties
Los Angeles
Cross Streets
Norwalk Boulevard
Zip
90606
Parcel #
817-601-160-27

Notice of Determination

Approving Agency
California Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.