Well 7991-1 Arsenic Removal System
3 Documents in Project
Summary
SCH Number
2004091082
Lead Agency
Coachella Valley Water District
(CVWD)
Document Title
Well 7991-1 Arsenic Removal System
Document Type
NOD - Notice of Determination
Received
Posted
11/3/2004
Present Land Use
Existing water well site. There would be no change in land use.
Z: AG
GP: Agriculture
Document Description
Construction and operation of a 2.88 mgd capacity arsenic removal system and auxiliary pipelines on 0.5 acres at existing District Well 7991-1 to reduce arsenic concentrations to meet drinking water requirements. In addition, a 700 cu yd percolation/evaporation pond for well blow-off water would be constructed on the site with connection to underlying tile drains. The treated, nonhazardous brine waste would be hauled for discharge to a nonreclaimable waste pipeline, the Santa Ana Regional Interceptor. The coagulated brine waste would be disposed of properly at a Class I hazardous waste landfill. Construction duration would be 7 weeks.
Contact Information
Name
Steve Robbins
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Riverside
Cross Streets
Avenue 67 / Hammond Road
Zip
92254
Total Acres
< 0.5
State Highways
111, 86, 195
Railways
SPRR
Airports
none
Schools
Mecca Elementary
Waterways
none
Township
7S
Range
9E
Section
17, NW
Base
SBBM
Other Location Info
City: Mecca
Other Information
Section: 1/4 of SE 1/4
Notice of Determination
Approving Agency
Coachella Valley Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.