Perris Water Filtration Plant Phase II and Lakeview Pipeline
6 Documents in Project
Summary
SCH Number
2004091058
Lead Agency
Eastern Municipal Water District
(EMWD)
Document Title
Perris Water Filtration Plant Phase II and Lakeview Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
4/10/2008
Present Land Use
Open Space/Open Space and May Ranch Specific Plan/City of Perris: Open Space and Specific Plan
Document Description
Metropolitan is proposing to grant a permanent easement to Assessor Parcel Number 303-310-009 (portions of Metropolitan Parcel Numbers 139-21-3,139-22-3 and 3A, and 139-23-1, 3, and 5). The permanent easement is being granted to Eastern Municipal Water District (EMWD) allow construction, operation, and maintenance of an EMWD water pipeline. Metropolitan also proposes to enter into an agreement with EMWD for construction of Service Connection EM-22. The service connection, which will be designed and constructed by EMWD in accordance with Metropolitan's standard specifications and design criteria, will provide for the delivery of 40 cubic feet per second of water to EMWD.
Contact Information
Name
Delaene W. Shane
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency
Phone
Location
Cities
Perris
Counties
Riverside
Cross Streets
various
Zip
92571
Parcel #
various
Township
4S
Range
3W
Section
9, 10
Base
SBBM
Notice of Determination
Approving Agency
Metropolitan Water District of Southern California
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.