Sandy Wool Dam Embankment Repair
3 Documents in Project
Summary
SCH Number
2004082107
Lead Agency
Santa Clara County
Document Title
Sandy Wool Dam Embankment Repair
Document Type
NOD - Notice of Determination
Received
Posted
6/28/2005
Present Land Use
Parks and Open Space
Document Description
Repair of an existing dam embankment along Sandy Wool Lake located in Ed R. Levin County Park. The dam embankment repair area is approximately 420 linear feet long and 30 feet wide. The proposed repair work will reconstruct the embankment (fronting Sandy Wool Lake) to its original condition of 3:1 (H:V) slope. A concrete cutoff curb will be placed at the toe of the new embankment (elevation 589'), and the new embankment will be covered with Mirafi filter fabric and an eight-inch geoweb erosion control system. Construction will occur when lake levels are at their lowest. The County will lower the lake level below elevation 589', such that all construction will be outside open water areas. Following placement of the geoweb system, the area will be revegetated with a mixture of grasses and forbs for additional erosion control. The Parks department will not allow recreational access across the top of the dam during the project. Signs will be posted at both ends of the work area informing park users of the construction activity and the temporary trail closure.
The Sandy Wool Dam embankment repair project is required to restore the embankment to its original configuration pursuant to the requirements of the State of California Division of Safety of Dams (DOD). There are no structures in the project area.
Contact Information
Name
Antoinette Romeo
Agency Name
Santa Clara County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Milpitas
Counties
Santa Clara
Cross Streets
Downing Road
Total Acres
0.29
Parcel #
02-34-002
State Highways
680
Waterways
Los Coches Creek
Township
5S
Range
3W
Other Location Info
Ed Levin County Park
Notice of Determination
Approving Agency
Santa Clara County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.