Interstate 680 HOV and Auxiliary Lanes (Sunol Grade Northbound)

2 Documents in Project

Summary

SCH Number
2004082022
Lead Agency
California Department of Transportation, District 4
Document Title
Interstate 680 HOV and Auxiliary Lanes (Sunol Grade Northbound)
Document Type
NOD - Notice of Determination
Received
Posted
11/1/2005
Document Description
Note: Project Report and project Approval Rescinded per Lead on 3/30/12. A northbound high occupancy vehicle (HOV) lane extending from the I-680/SR-237 interchange to SR-84, and five auxiliary lane segments extending from the Jacklin Road on-ramp to the Mission Boulevard/SR-238 off-ramp will be constructed. The southbound roadway will also be widened at two locations: (1) between the Andrade Road interchange and the Calaveras Road interchange, and (2) at the Sheridan Road interchange. Ramp metering equipment will be installed at fourteen northbound on-ramps beginning at Calaveras Boulevard and ending at Stoneridge Drive. Existing bridges will be widened. Sound barriers and retaining walls will also be constructed as necessary. The objective is to encourage carpooling and transit use through the HOV lane incentive and reduce congestion by providing more maneuvering room near high volume on/off-ramps.

Contact Information

Name
Kurt Findeisen
Agency Name
Department of Transportation, District 4
Contact Types
Lead/Public Agency

Location

Cities
Fremont, Milpitas, Pleasanton
Counties
Alameda, Santa Clara
Cross Streets
I-680 from Route 237 to Stoneridge Drive in Pleasanton
Zip
94537
State Highways
I-680
Railways
SPRR
Schools
Several
Waterways
Alameda Creek

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.