E Street Sewer and Storm Drain Project
4 Documents in Project
Summary
SCH Number
2004082004
Lead Agency
City of Lincoln
Document Title
E Street Sewer and Storm Drain Project
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2004
Document Description
Involves the replacement of approximately 8,000 LF of sewer line varying in size between 10 to 48 inches in diameter and the crossing of Auburn Ravine. In addition the project will install approximately 4,000 LF of storm water pipe varying in size between 30 to 48 inches in diameter. The project will include the elimination of two sewer lift stations and the installation of a water quality basin for storm water discharge.
Contact Information
Name
Rodney Campbell
Agency Name
City of Lincoln
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lincoln
Counties
Placer
Cross Streets
E Street
State Highways
65, 193
Railways
UPRR
Waterways
Aurburn Ravine
Township
12N
Range
6E
Section
15, 22
Notice of Determination
Approving Agency
City of Lincoln
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes