Community School No. 1

5 Documents in Project

Summary

SCH Number
2004081095
Lead Agency
Orange County Department of Education
Document Title
Community School No. 1
Document Type
NOD - Notice of Determination
Received
Posted
12/10/2004
Present Land Use
The General Plan designation for the proposed project site is General Commercial. The zoning designation is General Business. The project site has been utilized for agricultural operations in the past. A produce stand is currently located on the northwest corner of the site.
Document Description
The proposed project involves the construction and operation of Community School No. 1. The proposed project site is 5.8 acres and will include 5 buildings with a total floor area of 43,349 SF. Community School No. 1 will serve approximately 376 students, with a maximum student capacity not to exceed 594 students. The school will operate on a staggered schedule, with average attendance time per student of approximately 4 hours per day. Site access will be gained from Harbor Boulevard with one "entry only" and one "exit only" driveway. A 66-space parking area will be located at the northern edge of the proposed project site and will serve staff and visitors only.

Contact Information

Name
Andrea De La Cerda
Agency Name
Orange County Department of Education
Contact Types
Lead/Public Agency

Location

Cities
Fountain Valley
Counties
Orange
Cross Streets
Harbor Boulevard and Lilac Avenue
Total Acres
5.8
State Highways
405, SR 22
Schools
Los Alamitos High School, La Quinta High School and 13 elementar
Waterways
Santa Ana River, Ocean View Channel, East Garden Grove Wintersburg Channel

Notice of Determination

Approving Agency
Orange County Department of Education
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print