Wilson Reservoir in Garner Valley
3 Documents in Project
Summary
SCH Number
2004081025
Lead Agency
Lake Hemet Municipal Water District
Document Title
Wilson Reservoir in Garner Valley
Document Type
NOD - Notice of Determination
Received
Posted
9/21/2004
Present Land Use
Vacant
Z: R-A-20 (Residential Agricultural, 20 acre minimum lot size)
Document Description
The Wilson Reservoir in Garner Valley Project will involve the addition of a 0.5 million gallon water reservoir and an associated eight (8) inch water line to the existing domestic water system for Lake Hemet Municipal Water District (the "District") in the Garner Valley area of the unincorporated area of Riverside County. The District intends to either purchase approximately 0.4 acres of the land for the reservoir site in fee title and/or obtain an easement or right-of-way. An access slope and waterline easement will be obtained for approximately 1.4 acres of the land for the proposed water pipeline. The pipeline will be placed within an existing dirt trail that extends to within several hundred feet of the proposed reservoir site. The reservoir site will require grading to create a flat pad suitable for the placement of the reservoir. The existing dirt trail extending to the site from Hot Patch Springs Road may be paved to improve access to the reservoir site.
Contact Information
Name
Robert Lindquist
Agency Name
Lake Hemet Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Riverside
Cross Streets
Hop Patch Springs Road / Thomas Mountain Road
Total Acres
~2
Parcel #
575-290-002; 575-300-003
State Highways
74
Township
7S
Range
3E
Section
1
Base
SBB&M
Other Location Info
City: Garner Valley
Notice of Determination
Approving Agency
Lake Hemet Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.