Third Street Boat Ramp Improvement Project

Summary

SCH Number
2004079085
Lead Agency
Fish & Game #3
Document Title
Third Street Boat Ramp Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/27/2004
Document Description
The project involves the extension of an existing boat ramp at the Third Street Boat Ramp in Lakeport, Lake County (Section 24, T14N; R10W). The existing boat ramp will be widened and deepened and will include the installation of suspended boat boarding platforms. A sheet-pile retaining wall shall be constructed along the bank adjacent to the boat ramp. The project shall require the demolition and excavation of the existing concrete abutments with Clear Lake and installation of a sheet-pile retaining wall. Steel pipe pilings shall be driven into Clear Lake to provide support for the suspended boarding platforms. Base material, leveling rails and pre-cast concrete ramp segments shall be placed on the lake bottom. The new concrete boarding platform will be cast in place above the water line of Clear Lake. The second phase of the project will replace the existing rock slope protection with a sheet-pile retaining wall. This will require the removal of aquatic and riparian vegetation for approximately 300 linear feet. The CDFG is executing a renewal of Lake and Streambed Alteration Agreement Number 1600-2004-0367-3 pursuant to Section 1602 of the Fish and Game Code.

Contact Information

Name
Corinne Gray
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency

Location

Counties
Lake

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.