Cascade Drive Bank Stabilization Project

3 Documents in Project

Summary

SCH Number
2004072003
Lead Agency
City of Fairfax
Document Title
Cascade Drive Bank Stabilization Project
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2005
Present Land Use
Actively eroding stream bank adjacent to Cascade Drive in a wooded residential area.
Document Description
The operator proposes to stabilize a section of the left bank of San Anselmo Creek within the Town of Fairfax along Cascade Drive, opposite 570 Cascade Drive near the intersection of Canyon Road. The project includes the removal of existing rip-rap in a 100-foot long section of stream along Cascade Drive, clearing and grubbing the steambank within the project footprint, excavation of a toe trench, replacement of the rip-rap with an erosion control fabric and geocomposite baking, placement of willow cuttings within the rip-rap, installation of rock stream barbs to train the stream around the bend, installation of a root wad for fish habitat, construction of a shotcrete wall at the top-of-bank to support the roadway, and the planting of riparian vegetation. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0552-3 pursuant to Section 1602 of the Fish and Game Code to the project operator, Town of Fairfax.

Contact Information

Name
Bill Cox
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Fairfax
Counties
Marin
Cross Streets
Meadow Way
Zip
94930
Total Acres
75linearft.
Parcel #
003-022-17
Schools
Deer Park
Waterways
San Anselmo Creek
Township
2N
Range
7W
Section
34

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.