Eruv Line of Demarcation

2 Documents in Project

Summary

SCH Number
2004071113
Lead Agency
City of San Diego
Document Title
Eruv Line of Demarcation
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2004
Present Land Use
The project extends through various zone designations including residential, mixed use and commercial. The project is located entirely within the public-right-of-way.
Document Description
Public Right-of-Way Use Permit (Process 4) for the establishment of an Eruv. The Eruv would consist of a 19,590-linear-feet of monofilament line attached to the top of existing City light standards that extend along a defined route. The Beth Jacob Congregation is requesting that an Eruv be established in the College Area with the proposed route starting at the corner of Collwood Boulevard and Montezuma Road, extending east along Montezuma Road, continuing to the intersection of Montezuma Road and El Cajon Boulevard, then proceeding west on El Cajon Boulevard to the intersection of El Cajon Boulevard and 54th Street, then north on 54th Street / Collwood Boulevard to the starting point.

Contact Information

Name
Paul Schlitt
Agency Name
City of San Diego
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Collwood Boulevard
Total Acres
19,590
Parcel #
Entire project is within right-of-way
State Highways
163
Railways
Mission Vally West LTR
Airports
Montogmery Field
Waterways
San Diego River
Township
16Sout
Range
2West
Section
19

Notice of Determination

Approving Agency
City of San Diego, Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print