Mountain Park Specific Plan Amendment

6 Documents in Project

Summary

SCH Number
2004071098
Lead Agency
City of Anaheim
Document Title
Mountain Park Specific Plan Amendment
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2005
Present Land Use
Undeveloped with the exception of an approximate 300-acre sand and gravel mining, concrete and asphalt manufacturing facility which will be removed by June 2005. GP: Low Medium Hillside Residential (up to 6 du/acre), Low Medium Residential (up to 16 du/acre in the Mountain Park Specific Plan area), and Open Space. Z: Mountain Park Specific Plan (SP90-4)
Document Description
A proposal to amend the existing Mountain Park Specific Plan (SP 90-4). Implementation of the proposed project would allow for the following uses: a maximum of 2,500 residential units (reduced by applicant from a previously-vested entitlement for 7,966 units); a city fire station; a school site and adjacent public community park; trail staging area; store concession/interpretive center; public and private recreational facilities, including riding and hiking trails; and roadways and utilities necessary to serve the proposed development. Approximately 2,163 acres of open space consisting of Natural Communities Conservation Program (NCCP) open space areas, open space designated by conservation easements, and other open space would be preserved as part of the project. Additionally, the proposed project includes the construction of the SR-241/Weir Canyon Road interchange, and a bridge over SR-241 connecting development areas east and west of SR-241.

Contact Information

Name
Ted White
Agency Name
City of Anaheim
Contact Types
Lead/Public Agency

Location

Cities
Anaheim
Counties
Orange
Cross Streets
Santa Ana Canyon Road / Gypsum Canyon Road
Total Acres
3,001
State Highways
241, 91
Waterways
Santa Ana River
Other Location Info
The project site is located in Gypsum Canyon, south of the Riverside (SR-91) Freeway, in Orange County, CA. The Eastern Transportation Corridor (SR-241) bisects the site into eastern and western segments.

Notice of Determination

Approving Agency
Anaheim City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print