F.E. Weymouth Filtration Plant Oxidation Facilities and Site Improvements Program

8 Documents in Project

Summary

SCH Number
2004071097
Lead Agency
Metropolitan Water District of Southern California
Document Title
F.E. Weymouth Filtration Plant Oxidation Facilities and Site Improvements Program
Document Type
NOD - Notice of Determination
Received
Posted
6/25/2010
Document Description
The project consists of modifications and upgrades to the existing Weymouth treatment plant 66-kV substation and associated electrical lines: 1) decrease in size the electrical substation facility; 2) increase the sub-transmission line route (an increase of approximately 500 linear feet over the previously stated 3,700 feet); 3) underground 400 feet of overhead distribution line and associated facilities; 4) install a new 80 foot tubular steel riser pole and two new 55 foot wooden poles, and replace an existing wooden pole with an 80 foot tubular steel riser pole and two new 55 foot wooden poles, and replace an existing wooden pole with an 80 foot steel rise pole; 5) install three new telecommunication lines to provide relay protection to the Weymouth substation.

Contact Information

Name
Marty Meisler
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
La Verne
Counties
Los Angeles
Cross Streets
Wheeler Avenue / Holly Oak Street
Zip
91750
Total Acres
135
State Highways
30, I-210
Railways
SCRRA, BNSF
Airports
Brackett Field
Schools
Damien HS, Ramona JHS, Calvary
Waterways
Wheeler Creek
Township
1S
Range
9W
Section
1
Base
SB

Notice of Determination

Approving Agency
Metropolitan Water District of Southern California Board of Dire
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print