San Gabriel Valley Water Company Pretreatment Facilities at the Sandhill Water Treatment Plant

4 Documents in Project

Summary

SCH Number
2004071084
Lead Agency
City of Rialto
Document Title
San Gabriel Valley Water Company Pretreatment Facilities at the Sandhill Water Treatment Plant
Document Type
NOD - Notice of Determination
Received
Posted
5/22/2007
Present Land Use
Open Space and Residential
Document Description
Metropolitan has entered into an agreement for the construction of Service Connection CB-19 (Agreement No. A0-5066) with Inland Empire Utilities Agency. Metropolitan will design and construct the CB-19 on Metropolitan's Rialto Pipeline at Station 3841+89 with costs to be borne by Inland Empire.

Contact Information

Name
Michael E. Story
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Rialto
Counties
San Bernardino
Cross Streets
Riverside Drive / Linden Avenue
State Highways
15
Airports
Rialto Municipal Airport
Township
1N
Range
5W
Section
22
Base
SBM
Other Location Info
The project site is located in the City of Rialto along Riverside Drive and southeast of the intersection of Riverside Drive and Linden Avenue. This location can be viewed on the Devore, California 7.5 Minute Series USGS Topographic Map 1:24,000 scale.

Notice of Determination

Approving Agency
Metropolitan Water District of Southern California
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print