Opporutnity Study Site #1 - Tentative Tract Map 17543; Site Development Permit 3-16-4871

55 Documents in Project

Summary

SCH Number
2004071039
Lead Agency
City of Lake Forest
Document Title
Opporutnity Study Site #1 - Tentative Tract Map 17543; Site Development Permit 3-16-4871
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2016
Present Land Use
Baker Ranch Planned Community - Residential / Mixed Use
Document Description
Tentative Tract Map to subdivide 15.4 acres into three lots for multi-family residential development, 4 lots for private alleys, open space and utility easement purposes, and one public street; Site Development Permit: to construct 184 attached condominium dwelling units, private alleys, motor-courts, shared off-street parking spaces and associated site improvements. The SDP includes a request for an alternative development standards consisting of 24 ft. separation between buildings separated by ana lley at the second floor, and 28 feet separation between facing garages, in lieu of a 28 ft. minimum separation between buildings separated by an alley, and a 30 feet minimum separation between facing garages.

Contact Information

Name
Ron Santos
Agency Name
City of Lake Forest
Contact Types
Lead/Public Agency

Location

Cities
Lake Forest
Counties
Orange
Cross Streets
Bake Parkway / Dimension (future)
Zip
92630
Total Acres
386.8
Parcel #
610-421-17 thru 09; 610-422-01; 610-431-01 thru 12; 410-432-01 thru 17; 612-132-01, 612-134-05
State Highways
Hwy 241
Railways
No
Airports
No
Schools
Foothill ES
Waterways
Borrego Canyon Wash
Township
6S
Range
8W
Section
1,2,11
Base
SBB&M

Notice of Determination

Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print