Opportunity Study Site #1 - Site Development Permit 5-15-4800

55 Documents in Project

Summary

SCH Number
2004071039
Lead Agency
City of Lake Forest
Document Title
Opportunity Study Site #1 - Site Development Permit 5-15-4800
Document Type
NOD - Notice of Determination
Received
Posted
8/24/2015
Present Land Use
Baker Ranch Planned Community - Residential / Mixed Use
Document Description
Site Development Permit 5-15-4800 is a model home complex for Tract 17539. The model home complex is located on lots 95-100 of Tract 17539. The complex includes the construction of four of these units (lots 97-100), the alley and a parking lot with 10 parking stalls that include an accessible stall. The residence on lot 97 will be utilized as a sales office and the other three residences (lots 98-100) will be model homes. The project also includes a trellis over the entrance to sales office, a raised wooden deck next to the sales office, an accessible portable restroom, a 42-inch tall fence along Laurel and an American flag pole. Site Development Permit 5-15-4800 was evaluated in and contemplated by the SEIR that was prepared for the Shea/Baker Ranch project and certified by the City of Lake Forest City Council was evaluated in and contemplated by the Supplemental EIR that was prepared for the Shea/Baker Ranch project and certified by the City of Lake Forest City Council on May 15, 2012. The Shea/Baker Ranch certified SEIR was not challenged within the time period prescribed in subdivision (c) of Public Resources Code section 21167 and thus the SEIR is presumed valid in accordance with Public Resources Code section 21167.2. The proposed Site Development Permit is consistent with the scope of the approved Area Plan and Tentative Tract Map 16466. Therefore, the certified SEIR serves as the environmental documentation for the project and the project is in compliance with the requirements of CEQA.

Contact Information

Name
Jennifer Mansur
Agency Name
City of Lake Forest
Contact Types
Lead/Public Agency

Location

Cities
Lake Forest
Counties
Orange
Cross Streets
Bake Parkway / Dimension (future)
Zip
92630
Total Acres
386.8
Parcel #
610-421-17 thru 09; 610-422-01; 610-431-01 thru 12; 410-432-01 thru 17; 612-132-01, 612-134-05
State Highways
Hwy 241
Railways
No
Airports
No
Schools
Foothill ES
Waterways
Borrego Canyon Wash
Township
6S
Range
8W
Section
1,2,11
Base
SBB&M

Notice of Determination

Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print