Opportunity Study Site #1 - Site Development Permit 3-15-4747; Revised TPM 2013-153

55 Documents in Project

Summary

SCH Number
2004071039
Lead Agency
City of Lake Forest
Document Title
Opportunity Study Site #1 - Site Development Permit 3-15-4747; Revised TPM 2013-153
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2015
Present Land Use
Baker Ranch Planned Community - Residential / Mixed Use
Document Description
Development of a commercial center with two buildings and a future building pad on a 3.06-acre project site. The first building is a 6,000 sq ft multi tenant building; the second building is a 2,000 sq ft restaurant building with a drive through. The site plan includes a building pad for the future third building. The project was evaluated in and contemplated by the Supplemental Environmental Impact Report (SEIR) that was prepared for the Shea/Baker Ranch project and certified by the City of Lake Forest City Council on May 15, 2012. The Shea/Baker Ranch certified SEIR was not challenged within the time period prescribed in subdivision (c) of Public Resources Code section 21167 and thus the SEIR is presumed valid in accordance with Public Resources section 21167.2. The proposed project is consistent with scope of the approved Area Plan and Tentative Tract Map 16466. Therefore, the certified Supplemental Environmental Impact Report serves as the environmental documentation for the project and the project is in compliance with the requirements of CEQA.

Contact Information

Name
Carrie Tai
Agency Name
City of Lake Forest
Contact Types
Lead/Public Agency

Location

Cities
Lake Forest
Counties
Orange
Cross Streets
Bake Parkway / Dimension (future)
Zip
92630
Total Acres
386.8
Parcel #
610-421-17 thru 09; 610-422-01; 610-431-01 thru 12; 410-432-01 thru 17; 612-132-01, 612-134-05
State Highways
Hwy 241
Railways
No
Airports
No
Schools
Foothill ES
Waterways
Borrego Canyon Wash
Township
6S
Range
8W
Section
1,2,11
Base
SBB&M

Notice of Determination

Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print