Opportunity Study Site #1 - Site Development Permit 3-13-3198 (Tract 17532)

48 Documents in Project

Summary

SCH Number
2004071039
Lead Agency
Lake Forest, City of (City of Lake Forest)
Document Title
Opportunity Study Site #1 - Site Development Permit 3-13-3198 (Tract 17532)
Document Type
NOD - Notice of Determination
Received

Document Description
The requested Site Development Permit provides for the construction of two-story single-family homes (one per lot) with attached two-car garages on 80 lots; and associated improvements, including driveway paving, parkway landscaping and walls/fences. All lots are previously approved and rough graded per Tentative Tract Map 16466. The project includes three floor plans (2,966, 2,997 and 2,999 sq. ft. respectively, with options for an additional 522 sq. ft. approximately for Plan 1), three different architecture styles and four color schemes. Each unit will include a two-car garage and a two-car driveway. 114 on-street spaces are available.

Contact Information
Ron Santos
City of Lake Forest
25550 Commercecentre Drive
Lake Forest, CA 92630

949 461 3449

Location

Cities
Lake Forest
Counties
Orange
Cross Streets
Bake Parkway / Dimension (future)
Zip
92630
Total Acres
386.8
Parcel #
610-421-17 thru 09; 610-422-01; 610-431-01 thru 12; 410-432-01 thru 17; 612-132-01, 612-134-05
State Highways
Hwy 241
Railways
No
Airports
No
Schools
Foothill ES
Waterways
Borrego Canyon Wash
Township
6S
Range
8W
Section
1,2,11
Base
SBB&M

Notice of Determination

Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
25550 Commercentre Drive, Suite 100, Lake Forest CA 92630

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search