Windsor Creek Subdivision Phase 3

Summary

SCH Number
2004069067
Lead Agency
Fish & Game #3
Document Title
Windsor Creek Subdivision Phase 3
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2004
Document Description
Installation of a 36 foot wide, 42 foot long Conspan ore-cast arch culvert over East Windsor Creek at the Bell Road crossing in Windsor, Sonoma County. The Conspan arch is a bottomless structure set on cast-in place concrete footings. The streambed inside the culvert will be lined with loose rock. The CDFG is executing a Lake and Streambed Alteration Agreement Number 1600-2004-0302-3 pursuant to Section 1602 of the Fish and Game Code to the project operator, MLB Homes.

Contact Information

Name
Bill Cox
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency

Location

Counties
Napa

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print