Tesla Power Project

Summary

SCH Number
2004069038
Lead Agency
California Energy Commission
Document Title
Tesla Power Project
Document Type
NOD - Notice of Determination
Received
Posted
6/16/2004
Document Description
The project will be an 1120 MW power plant consisting of a 4 7FA natural gas fired combined cycle power generators, with 2 seam turbine-generators. A double-circuit 230-kV transmission line connected to the Tesla PG&E substation, 24 inch natural gas pipeline, and reclaimed water line constructed from the city of Tracy.

Contact Information

Name
Jack W. Caswell
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency

Location

Counties
Alameda

Notice of Determination

Approving Agency
California Energy Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print