B & B Heavy Equipment Site Plan, STP 02-035, Log No. 98-10-014B

Summary

SCH Number
2004069016
Lead Agency
San Diego County
Document Title
B & B Heavy Equipment Site Plan, STP 02-035, Log No. 98-10-014B
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2004
Document Description
The project proposes to relocated B&B from its existing legal non-conforming use location at Riverside Drive and Palm Row (less than 1 mile east), to this site on the west side of Riverford Road. The business will be relocated to approximately 10 acres of an approximate 52-acre lot. Two buildings, related parking, heavy equipment wash area, aboveground storage tanks, and other facilities will be constructed on 5 acres of the site. The project also proposes to have outside heavy equipment storage not to exceed 10 percent of the project site area. Building A will be a two-story building, the first floor will be the corporate offices, replacement parts room and equipment repair facilities for the B&B Heavy Equipment company. The second building, building B, is one story and will be for additional repair facilities, fabrication of replacement parts and enclosed paint booth for B&B Heavy Equipment Company.

Contact Information

Name
Megan Jones
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Other Location Info
Lakeside

Notice of Determination

Approving Agency
County of San Diego Director of Planning of Land Use
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print