Jack Smith Park

3 Documents in Project

Summary

SCH Number
2004061124
Lead Agency
City of Needles
Document Title
Jack Smith Park
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2004
Present Land Use
Recreational
Document Description
CDFG is executing a Lake or Streambed Alteration Agreement (SAA#1600-2004-0072-R6) pursuant to Section 1602. The Operator proposes to alter the bed, bank, and channel of the Colorado River by implementing the following project-related activities, including: 1) sweep fish from boat launch channel and associated backwaters towards the Colorado River; 2) install temporary sheetpile cofferdams or portadams to facilitate dredging of 2.6 acre area bounded by the cofferdams or portadams to a depth of 447.5 feet NGVD by removal of approximately 30,000 cubic yards of material and sediment; 4) construct temporary berms on a U.S. Bureau of Reclamation owned parcel of land immediately west of Jack Smith Park and place dredged material within area bounded by berms; 5) jetty construction and slope stabilization; 6) replacement of the existing two-lane boat launch ramp with a 120' x 76' 4-lane pre-cast concrete ramp; 7) replacement of one existing boarding float and piling with two new 80' x 6' aluminum boarding floats, and a total of six 8" steel pipe piling; 8) clearing of 0.3 acres of riparian vegetation located on the jetty structure; and 9) installation of catch basins and sumps on existing parking lot.

Contact Information

Name
Arturo Delgado
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Needles
Counties
San Bernardino
Cross Streets
River Road / Reclammation Road
Zip
92363
Total Acres
8
State Highways
40, 95
Waterways
Colorado River
Township
9N
Range
23E
Section
33
Base
SBM

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print