Expansion at San Elijo Elementary School
4 Documents in Project
Summary
SCH Number
2004061059
Lead Agency
San Marcos Unified School District
Document Title
Expansion at San Elijo Elementary School
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2011
Present Land Use
Single Family Residential
Document Description
Due to an increase in the number of students at the School and residential growth in the area of the School, the District desires to (1) add four relocatable classrooms to accommodate approximately 120 additional students, (2) add two additional relocatable classrooms for before and after school child care, (3) widen Schoolhouse Way, in the area immediately adjacent to the school, (4) expand the existing parking lot to add additional parking spaces necessary to accommodate parking demands arising in connection with both existing students and the additional student capacity added by the addition of more relocatable classrooms. Schoolhouse Way, in the areas to be widened by this Project, is a private road that is owned and maintained by the District. The purpose of the street widening and parking lot expansion is to alleviate traffic congestion at the School associated with the dropping off and picking up of students.
This Project will increase the student capacity from an existing approximate 1,120 student capacity to approximately 1,240 students. Additionally, the child care relocatables may be used in the future to accommodate additional student capacity, potentially accommodating up to 60 additional students, or 1,300 students total.
Contact Information
Name
Katherine Tanner
Agency Name
San Marcos Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Marcos
Counties
San Diego
Cross Streets
San Elijo Road & SchoolHouse Way
Zip
92078
Total Acres
12.9
Parcel #
223-042-05-00
Schools
San Marcos Unified
Waterways
San Marcos Creek, Lake San Marcos
Township
12S
Range
3W
Section
28
Base
SBB&M
Notice of Determination
Approving Agency
San Marcos Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.