Proposed Atwater Elementary School New Site and Construction, Atwater, Merced County, CA
2 Documents in Project
Summary
SCH Number
2004061042
Lead Agency
Atwater Elementary School District
(AESD)
Document Title
Proposed Atwater Elementary School New Site and Construction, Atwater, Merced County, CA
Document Type
NOD - Notice of Determination
Received
Posted
7/14/2004
Present Land Use
The existing school site is zoned by Merced County for Agriculture. The City of Atwater General Plan designates the site for Medium Residential Density.
Document Description
An Initial Study for the proposed project has been prepared. It was determined by the Lead Agency that the proposed action will not result in significant impacts if mitigation measures are implemented. Site work will include relocating the man-made irrigation canal presently on the site, road (Avenue One) improvements, connections to existing utilities over 3,000 ft. from the property, and other site improvements. The new school would have an eventual capacity of 600 to 650 students and 30 to 35 teachers and staff. It is anticipated that the school would open for the 2006 school year.
Contact Information
Name
Ron Denault
Agency Name
Atwater Elementary School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Atwater
Counties
Merced
Cross Streets
Buhach Road
Parcel #
005-11-0-14
State Highways
Highway 99
Railways
Yes
Airports
Yes
Waterways
Merced Irrigation Canal & Canal Creek
Township
7S
Range
13E
Section
8
Base
MDM
Notice of Determination
Approving Agency
Atwater Elementary School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.