Turri Road Bridge at Warden Creek Replacement Project

2 Documents in Project

Summary

SCH Number
2004061030
Lead Agency
San Luis Obispo County
Document Title
Turri Road Bridge at Warden Creek Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/21/2004
Present Land Use
Irrigated row crops, existing county roadway / Agriculture
Document Description
A proposal by San Luis Obispo County Public Works Department to replace the existing two-span, timber mat Turri Road Bridge over Warden Creek with a single span, cast-in place, reinforced concrete slab bridge. The existing bridge, constructed in 1951, is functionally obsolete and a threat to public safety. Major components of the project include removing and replacing the existing bridge, constructing and removing a temporary 20-foot wide gravel-surfaced traffic detour, creek bank stablization, and restoring creek banks disturbed during construction to preconstruction condition.

Contact Information

Name
Eric N. Wier
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency

Location

Counties
San Luis Obispo
Cross Streets
Turri Road and Los Osos Valley Road
Zip
93402
Total Acres
1.23
Parcel #
067-031-021
Waterways
"Warden Creek", Los Osos Creek
Township
30S
Range
11E
Base
MDBM
Other Location Info
City: Los Osos

Notice of Determination

Approving Agency
Planning Department Hearing
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print