Westlake Village Outfall Construction Project
10 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2004052105
- Lead Agency
- City of Stockton
- Document Title
- Westlake Village Outfall Construction Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/17/2018
- Present Land Use
- Agriculture, Commercial Recreation
- Document Description
- The Central Valley Regional Water Board is issuing a 401 Water Quality Certification for the subject Project. The project will install one storm water outfall and associated structures that will convey storm water from the Westlake Villages development into Disappointment Slough. The outfall structure includes a cast-in-place concrete headwall, dispersion apron, and Armorflex mats. The headwall will measure approx. 7 feet tall, and will be 15 feet wide by 36-feet long, with side wing walls running from the headwall to the dispersion apron. Five 30-inch diameter discharge pipes will run through the headwall and will be fitted with Tidalflex valve to prevent backflow.
- Contact Information
-
Peter Minkel
Central Valley RWQCB
Lead/Public Agency
11020 Sun Center Dr. #200
Rancho Cordova, CA 95670
Phone : (916) 464-4684
Location
- Cities
- Stockton
- Counties
- San Joaquin
- Cross Streets
- Eight Mile Road / Rio Bianco Road
- Zip
- 95219
- Total Acres
- 852
- Parcel #
- 071-012-13, 11, 055-310-04, 05, 06
- State Highways
- I-5
- Railways
- Union Pacific
- Schools
- McAuliffe, Julia Morgan, Bear Creek
- Waterways
- Pixey Slough, Disappointment Slough, Bishop Cut, Telephone Cut
- Township
- 2N
- Range
- 5E
- Section
- 2 & 3
- Base
- MD
Notice of Determination
- Approving Agency
- Central Valley RWQCB
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 11020 Sun Center Dr. #200, Rancho Cordova, CA 95670
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.