Streambed Alteration Agreement Number (SAA) 1600-2005-0439-R5 for the El Capitan Bridge Replacement Project

51 Documents in Project

Summary

SCH Number
2004052087
Lead Agency
Fish & Game #3
Document Title
Streambed Alteration Agreement Number (SAA) 1600-2005-0439-R5 for the El Capitan Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2005
Document Description
The project consists of removing an Arizona crossing which is a barrier to steelhead, and replacing the crossing with a pre-fabricated arched culvert bridge with a natural bottom. The new bridge will be about 20 feet wide and 250 feet long. The existing crossing will act as an access and pad to construct the abutments. Fill will be placed in the area cut for access to the Arizona crossing, to restore the original banks. The project will temporarily impact 0.2 acres of central coast sycamore/willow riparian habitat. El Capitan Creek has historical data showing that it contained a population of spawning steehead, which had been eliminated by barriers. This is the first of the two barriers which are slated for removal, and is being funded by the State Fisheries Restoration Grant Program.

Contact Information

Name
Natasha Lohmus
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Other Location Info
Dutch Bill Creek Watershed

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print