Humboldt State University, Certify the Final EIR and Approve the Campus Master Plan Revision

9 Documents in Project

Summary

SCH Number
2004052085
Lead Agency
California State University Board of Trustees
Document Title
Humboldt State University, Certify the Final EIR and Approve the Campus Master Plan Revision
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2004
Present Land Use
PF (Public Facility)
Document Description
The campus master plan will guide the physical development of the campus through 2030 and beyond. The key physical elements of the master plan revision include: the creation of new academic quadrangles; restoration of two streams on campus; interconnecting pedestrian pathways and open space; the removal of vehicles from the campus core; the conversion of B Street, 17th Street, and Laurel Street to pedestrian malls and creation of a major campus entry at Harpst with an on-campus transit center. These changes provide a new vision for the campus to improve the instructional facilities in a coordinated manner with accessibility and site safety improvements.

Contact Information

Name
Robert Schulz
Agency Name
Trustees of the California State University
Contact Types
Lead/Public Agency

Location

Cities
Arcata
Counties
Humboldt
Cross Streets
U.S. 101 and 14th Street
Zip
95521
Total Acres
~144
State Highways
101,299,255
Railways
Union Pacific
Schools
Arcata High, Pacific Union, Jacoby Cr.
Waterways
Humboldt Bay, Jolly Giant Creek, Janes Creek
Township
6N
Range
1E
Section
28
Base
Humboldt

Notice of Determination

Approving Agency
Trustees of the California State University
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print