Culvert Replacement at 1600 Old Rancheria Road (Lake or Streambed Alteration Agreement No. 1600-2016-0208-R3

16 Documents in Project

Summary

SCH Number
2004052008
Lead Agency
Marin Resource Conservation District
Document Title
Culvert Replacement at 1600 Old Rancheria Road (Lake or Streambed Alteration Agreement No. 1600-2016-0208-R3
Document Type
NOD - Notice of Determination
Received
Posted
9/27/2016
Present Land Use
Various - largely rural & rural residential, agricultural
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0208-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, SNk Ltd. LP as represented by Catherine Warfield. Project includes excavation and removal of a perched and misaligned 15-foot-long, 48-inch diameter corrugated metal pipe and installing a new 30-foot long, 54-inch diameter corrugated metal pipe culvert. The left bank below the culvert will be laid back and the channel upstream of the culvert will also be graded with stable slopes and then revegetated.

Contact Information

Name
Timothy S. Dodson
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Counties
Marin
Cross Streets
East Ridge Rd and Pan Toll Rd, north Hwy 1 and Valley Ford-Petaluma Rd and vicinity
Zip
94956
Parcel #
Multiple
State Highways
Hwy 1
Railways
No
Airports
No
Waterways
Lagunitas Creek, Estero de San Antonio
Other Location Info
City/Community: Pt. Reyes Station, Tomales

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print