Bridge Maintenance Priority Projects
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2004051088
- Lead Agency
- Monterey County
- Document Title
- Bridge Maintenance Priority Projects
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/6/2005
- Document Description
- Monterey County Bridge 519 spans a tributary of the Carmel River (Hitchcock Canyon Creek) on Southbank Road, to the south of Carmel Valley Village. The operator proposes to extend the concrete wingwall downstream of the bridge, and to fill in a scoured area in the vicinity. The channel is constrained at the downstream end of the bridge into a narrow semi-natural chute, and constrained flows are scouring beneath the wingwall on the right bank. The adjacent bridge retaining wall also needs repair. Dredge material shall be contained outside of the stream zone and will ultimately be used onsite for backfill. the project is limited to the vicinity of the existing footing, with a footprint of approximately 250 sf. Rip rap shall be used after completion of repairs. Rubberized tire heavy equipment will be used for this activity and shall be limited to the repair area only. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0370-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Vic Lewis / Monterey County Public Works Department.
- Contact Information
-
Serge Glushkoff
California Department of Fish and Game
Lead/Public Agency
P.O. Box 47
Yountville, CA 94599
Phone : (707) 944-5597
Location
- Cities
- Carmel, Greenfield, Salinas Carmel-by-the-Sea Greenfield Salinas
- Counties
- Monterey
- Cross Streets
- Various
- Waterways
- Salinas River, Carmel River and Tributaries, Gavilan Creek
Notice of Determination
- Approving Agency
- California Department of Fish and Game
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Monterey County Public Works Dept. 855 E. Laurel Street, Building B Salinas, CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.