Bridge Maintenance Priority Projects

5 Documents in Project

Summary

SCH Number
2004051088
Lead Agency
Monterey County
Document Title
Bridge Maintenance Priority Projects
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2005
Document Description
Monterey County Bridge 519 spans a tributary of the Carmel River (Hitchcock Canyon Creek) on Southbank Road, to the south of Carmel Valley Village. The operator proposes to extend the concrete wingwall downstream of the bridge, and to fill in a scoured area in the vicinity. The channel is constrained at the downstream end of the bridge into a narrow semi-natural chute, and constrained flows are scouring beneath the wingwall on the right bank. The adjacent bridge retaining wall also needs repair. Dredge material shall be contained outside of the stream zone and will ultimately be used onsite for backfill. the project is limited to the vicinity of the existing footing, with a footprint of approximately 250 sf. Rip rap shall be used after completion of repairs. Rubberized tire heavy equipment will be used for this activity and shall be limited to the repair area only. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0370-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Vic Lewis / Monterey County Public Works Department.

Contact Information

Name
Serge Glushkoff
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Carmel, Greenfield, Salinas, Carmel-by-the-Sea, Greenfield, Salinas
Counties
Monterey
Cross Streets
Various
Waterways
Salinas River, Carmel River and Tributaries, Gavilan Creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print