Bridge Maintenance Priority Projects
5 Documents in Project
Summary
SCH Number
2004051088
Lead Agency
Monterey County
Document Title
Bridge Maintenance Priority Projects
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2005
Document Description
Monterey County Bridge 309 is located on Gonzales River road (MP 0.65), about 2.6 miles west of Alta Street in the City of Gonzales, and spans the Salinas River. Scout has eroded the southeasterly abutment of the bridge. The proposed project consists of placing riprap boulders at the scoured area. Riprap material will be placed during dry conditions. A rubberized tire front end loader shall be used to shape the scoured area to an approximate dimension of 15' length x 6' width x 6' depth to key in the riprap. A layer of engineering fabric shall be installed and anchored prior to placement of the clean riprap. Maintenance activities shall be limited to the repair area only, and impact to existing vegetation shall be minimal. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0312-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Vic Lewis / Monterey County Public Works Dept.
Contact Information
Name
Serge Glushkoff
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Carmel, Greenfield, Salinas, Carmel-by-the-Sea, Greenfield, Salinas
Counties
Monterey
Cross Streets
Various
Waterways
Salinas River, Carmel River and Tributaries, Gavilan Creek
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No