Bridge Maintenance Priority Projects

5 Documents in Project

Summary

SCH Number
2004051088
Lead Agency
Monterey County
Document Title
Bridge Maintenance Priority Projects
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2005

Document Description
Monterey County Bridge 132 crosses Gabilan Creek at Natividad Road. The Operator proposes to repair ongoing, cumulative scour damage at a single bank abutment with riprap. A rubberized tire front end loader will be used to shape the scoured area to a dimension of approximately 20' long x 6' wide x 6' deep to key the riprap in place. Engineering fabric shall be installed and anchored prior to rock placement. Access to the project site shall be from the southern side of the bridge within the bridge right-of-way. Maintenance activity shall be limited to the repair area only, and impact to the existing vegetation shall be minimal. Revegetation and planting shall be accomplished upon completion of work. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0369-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Vic Lewis / Monterey County Public Works Dept.

Contact Information
Serge Glushkoff
California Department of Fish and Game
Lead/Public Agency
P.O. Box 47
Yountville, CA 94599

Phone : (707) 944-5597

Location

Cities
Carmel, Greenfield, Salinas Carmel-by-the-Sea Greenfield Salinas
Counties
Monterey
Cross Streets
Various
Waterways
Salinas River, Carmel River and Tributaries, Gavilan Creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
Monterey County Public Works Dept. 855 E. Laurel Street, Building B Salinas, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print