Bridge Maintenance Priority Projects
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2004051088
- Lead Agency
- Monterey County
- Document Title
- Bridge Maintenance Priority Projects
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/6/2005
- Document Description
- Monterey County Bridge 509 spans a tributary of the Carmel River (Hitchcock Canyon Creek) on Esquiline Road, to the south of Carmel Valley Village. The proposed project would take place under the existing deck structure and on the concrete bottom of the facility. The failing bent will be replaced by a suitable steel unit. There is no dredging or filling nor discharge of materials on the streambed involved in this activity. A rubberized crane will be used for this activity and shall be positioned on the pavement to lower the beams into place. The beams shall then be hand cranked into position. Access would be limited to an approximately two-foot wide pedestrian path. All work shall be conducted during dry conditions with little or no water in the culvert below the bridge. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0368-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Vic Lewis / Monterey County Public Works Department.
- Contact Information
-
Serge Glushkoff
California Department of Fish and Game
Lead/Public Agency
P.O. Box 47
Yountville, CA 94599
Phone : (707) 944-5597
Location
- Cities
- Carmel, Greenfield, Salinas Carmel-by-the-Sea Greenfield Salinas
- Counties
- Monterey
- Cross Streets
- Various
- Waterways
- Salinas River, Carmel River and Tributaries, Gavilan Creek
Notice of Determination
- Approving Agency
- California Department of Fish and Game
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Monterey County Public Works Dept. 855 E. Laurel Street, Building B Salinas, CA
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.