Whittaker-Bermite Facility Operable Unit 1, Remedial Action Plan

4 Documents in Project

Summary

SCH Number
2004051053
Lead Agency
Department of Toxic Substances Control
Document Title
Whittaker-Bermite Facility Operable Unit 1, Remedial Action Plan
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2008
Present Land Use
Undeveloped
Document Description
The State of California Department of Fish and Game is entering into a Lake and Streambed Alteration Agreement (SAA #1600-2008-0154-R5) pursuant to Section 1602 of the Fish and Game Code with Whittaker Corporation. The applicant proposes to alter the streambed to remove contaminated soils from the Whittaker Bermite facility (Site) in Operable Unit 1 (OU1). OU1B-Drainage bottom from the Area 55 operations pad. Approximately 2,070 cubic yards of materials will be removed from the channel at a depth of about 15 feet. The soils will be cleaned and replaced. The site will be re-graded to pre-existing conditions and reseeded with native seed mix. OU1C-Drainage bottom from the toe of Golden Valley Road. Approximately 1,680 cubic yards of materials will be removed from the channel at a depth of about 15 feet. The soils will be cleaned and replaced. The site will be regarded to pre-existing conditions and reseeded with native seed mix.

Contact Information

Name
Jeff Humble
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Santa Clarita
Counties
Los Angeles
Cross Streets
22116 West Soledad Canyon Road
Zip
91350
Total Acres
230
Parcel #
2836-012-010, -011
State Highways
~ 4 miles
Railways
Metrolink
Airports
Whiteman (~12 mi)
Schools
Golden Valley HS, Creative Years, His Little Lamb, CBS Ed. Cente
Waterways
Santa Clara River
Township
4N
Range
16W
Section
23-26

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print