Robertson Ranch Habitat Corridor Grading
12 Documents in Project
Summary
SCH Number
2004051039
Lead Agency
City of Carlsbad
Document Title
Robertson Ranch Habitat Corridor Grading
Document Type
NOD - Notice of Determination
Received
Posted
1/25/2007
Present Land Use
Vacant / Agriculture / Nursery / One SFR; Planned Community (PC); Residential Low-Medium (RLM), Residential Medium (RM); Residential Low-Medium (RLM 0-4 du/ac), Residential Medium (RM 4-8 du/ac), Residential Medium-High (RMH 8-15 du/ac), Residential High Density (RH 15-23 du/ac), Elementary School (E), Open Space (OS), Local Shopping Center (L), Community Facility (CF).
Document Description
Request for approval of a Floodplain Special Use Permit (SUP) and Hillside Development Permit (HDP) for grading of the central habitat corridor within the Robertson Ranch Master Plan in accordance with the terms of the Robertson Ranch Program EIR Mitigation Measures. The project was described in the Program EIR for the Robertson Ranch Master Plan and the proposed activities will have no effects beyond those analyzed in the Program EIR.
Contact Information
Name
Barbara Kennedy
Agency Name
City of Carlsbad
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carlsbad
Counties
San Diego
Cross Streets
El Camino Real, Tamarack Ave, Cannon Rd, College Blvd
Total Acres
398
Parcel #
168-050-47, 48
State Highways
I-5
Railways
NCTD
Airports
McClellan / Palomar
Schools
Carlsbad Unified School District
Waterways
Pacific Ocean, AguaHedionda Lagoon
Township
11S
Range
4W
Section
Unsect
Base
Quad San
Other Information
Section: portion of Agua Hedionda Rancho
Base: Quad San Luis Rey
Notice of Determination
Approving Agency
City of Carlsbad
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.