Draft EIR for the Proposed Prado Basin Water Supply, Riverside and San Bernardino Counties, CA
5 Documents in Project
Summary
SCH Number
2004051004
Lead Agency
Orange County Water District
Document Title
Draft EIR for the Proposed Prado Basin Water Supply, Riverside and San Bernardino Counties, CA
Document Type
NOD - Notice of Determination
Received
Posted
8/21/2006
Present Land Use
Flood control, water conservation, recreation, mineral (leases)
Document Description
The proposed project would capture additional surplus water behind Prado Dam during the flood season, thus raising the elevation of the conservation pool. The project would modify the United States Army Corps of Engineer's (USACE's) operational control manual for Prado Dam, but would require no additional construction. During the flood season, a greater volume of water could be impounded behind the dam, up to elevation 498 feet mean sea level. The four-foot increase in the water storage elevation would allow up to an additional 5,205 acre-feet of water storage. During the non-floor season, water would continue to be impounded up to elevation 505 feet msl, as with existing operations.
Contact Information
Name
Greg Woodside
Agency Name
Orange County Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Anaheim, Chino, Chino Hills, Corona, Corona, Norco, Chino, Chino Hills, Anaheim, Orange, ..., Norco, Orange, Yorba Linda
Counties
Riverside, San Bernardino
Cross Streets
Numerous
Zip
91710, 928
Parcel #
Various
State Highways
SR-91, SR-71
Railways
BNSF and UPRR
Airports
Corona Municipal Airport
Waterways
Santa Ana River, Chino Creek, Mill Creek, Temescal Creek
Township
3S
Range
7W
Section
20 &
Base
Prado Da
Other Information
Zip Code: 92880 and others
Section: & others
Base: Dam
Notice of Determination
Approving Agency
Orange County Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.