1999.455E, New DeYoung Museum
Summary
- SCH Number
- 2004049016
- Lead Agency
- City and County of San Francisco
- Document Title
- 1999.455E, New DeYoung Museum
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/5/2004
- Document Description
- The proposed project would demolish and reconstruct the M.H. de Young Museum of the site of the existing de Young Museum in Golden Gate Park. The project would include demolition of eight existing buildings, totaling approximately 230,000 sq. ft., which compose the de Young Museum and the Asian Art Museum. The new building would include two main levels about grade, one level below grade with a varying roof height ranging from 33 to 48 feet, and a 144-foot tower at the northeast corner of the project site. The building would increase current de Young Museum gallery and exhibition space at the site from the existing 37,000 sq. ft. to total about 75,000 sq. ft. The project would remove the 85 existing paved parking spaces for museum staff, currently o n the eastern side of the museum and would not provide replacement parking.
- Contact Information
-
Joy Navarrete
San Francisco, City and County Planning Dept.
Lead/Public Agency
1660 Mission Street, Suite 500
San Francisco, CA 94103-2414
Phone : (415) 558-5975
Location
Notice of Determination
- Approving Agency
- City and County of San Francisco
- Approving Agency Role
- Lead Agency
- Final Environmental Document Available at
- Central Permit Bureau 1660 Mission Street San Francisco, CA 94103
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.