Santa Ana River Interceptor Protection/Relocation Project
9 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2004044001
- Lead Agency
- United States Army, Army Corps of Engineers (USACE)
- Document Title
- Santa Ana River Interceptor Protection/Relocation Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/3/2010
- Present Land Use
- Infrastructure, Recreation, Wildlife Habitat Management, Waterway, Flood Control
- Document Description
- The project consists of the installation of two wastewater pipelines with a combined total length of approximately 3.9-miles. Construction of the new 54-inch SARI pipeline will start at the existing metering station and cross the Orange County section of the Green River Golf Club property from northeast to southwest and cross beneath the Santa Ana River via micro-tunneling. The alignment completes the route by continuing along a maintenance access road around the east side of the SAVI Ranch until it connects to the existing SARI line that will remain in place. The total length of the propsoed SARI replacement pipeline is approximately 3.9-miles (20,700 feet).
- Contact Information
-
Mr. Barabe
Department of Fish and Game
Lead/Public Agency
4949 Viewridge Ave
San Diego, CA 92123
Phone : (858) 467-2717
Location
- Coordinates
- 33°52'12"N 117°40'18"W
- Cities
- Yorba Linda
- Counties
- Orange
- Cross Streets
- Weir Canyon Road, La Palma Avenue, 91 Freeway
- Zip
- 92887
- Total Acres
- 6.88 miles
- Parcel #
- Many
- State Highways
- Hwy 71, 91, 241
- Railways
- BNSF
- Airports
- No
- Schools
- Bryant Ranch & Running Springs
- Waterways
- Santa Ana River
- Township
- 3S
- Range
- 8W
- Section
- 36
- Base
- SBB&M
- Other Information
- Section Continued: 32
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Orange County Public Works 300 North Flower Street Santa Ana, CA 92703
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.