Santa Ana River Interceptor Protection/Relocation Project

9 Documents in Project

Summary

SCH Number
2004044001
Lead Agency
United States Army, Army Corps of Engineers (USACE)
Document Title
Santa Ana River Interceptor Protection/Relocation Project
Document Type
NOD - Notice of Determination
Received
Posted
12/3/2010
Present Land Use
Infrastructure, Recreation, Wildlife Habitat Management, Waterway, Flood Control
Document Description
The project consists of the installation of two wastewater pipelines with a combined total length of approximately 3.9-miles. Construction of the new 54-inch SARI pipeline will start at the existing metering station and cross the Orange County section of the Green River Golf Club property from northeast to southwest and cross beneath the Santa Ana River via micro-tunneling. The alignment completes the route by continuing along a maintenance access road around the east side of the SAVI Ranch until it connects to the existing SARI line that will remain in place. The total length of the propsoed SARI replacement pipeline is approximately 3.9-miles (20,700 feet).

Contact Information

Name
Mr. Barabe
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Yorba Linda
Counties
Orange
Cross Streets
Weir Canyon Road, La Palma Avenue, 91 Freeway
Zip
92887
Total Acres
6.88 miles
Parcel #
Many
State Highways
Hwy 71, 91, 241
Railways
BNSF
Airports
No
Schools
Bryant Ranch & Running Springs
Waterways
Santa Ana River
Township
3S
Range
8W
Section
36
Base
SBB&M
Other Information
Section Continued: 32

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print