Bullards Bar Quarry Reclamation Plan
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2004042134
- Lead Agency
- California Department of Conservation, State Mining and Geology Board Division (SMGB)
- Document Title
- Bullards Bar Quarry Reclamation Plan
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/27/2004
- Present Land Use
- Agriculture Rural Residential / Timber Preserve Zone
- Document Description
- The project is a reclamation plan pursuant to California's Surface Mining and Reclamation Act of 1975 for the proposed Bullards Bar Quarry. The proposed quarry will consist of mining and crushing approximately 623,000 cubic yards of rock to produce road base and rip rap. These products will be produced at a rate of approximately 60,000 cubic yards per year for a period of 10 years.
- Contact Information
-
John Parrish
Dept. of Conservation, Mining and Geology Board
Lead/Public Agency
801 K Street, MS 20-15
Sacramento, CA 95814
Phone : (916) 322-1082
Location
- Counties
- Yuba
- Cross Streets
- Marysville Road / New Bullars Bar Dam
- Zip
- 95935
- Total Acres
- 12.6
- Parcel #
- 064-260-016, -017
- Waterways
- Bullards Bar Reservoir / Yuba River
- Township
- 18 N
- Range
- 7 E
- Section
- 36
- Base
- MDBM
- Other Location Info
- Nearest City: Dobbins
Notice of Determination
- Approving Agency
- State Mining & Geology Board
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- State Mining and Geology Board 801 K Street, Room 2015 Sacramento, California 95814
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.