Eastern Sacramento County Replacement Water Supply Project

4 Documents in Project

Summary

SCH Number
2004042122
Lead Agency
Sacramento County Water Agency
Document Title
Eastern Sacramento County Replacement Water Supply Project
Document Type
EIR - Draft EIR
Received
Present Land Use
Alignments are currently open space zoned Special Planning Area and designated for Intensive/Extensive Industrial
Document Description
SCWA proposes to provide for beneficial use, including groundwater recharge, of 31,500 AFA of remediated water from existing and proposed Aerojet General Corporation and McDonnell Douglas Corporation (MDC)/Boeing Groundwater Extraction and Treatment (GET) facilities. Remediated groundwater from GET facilities is proposed to be conveyed to four discharge locations that flow into the American River, including Alder Creek, Buffalo Creek, Boyd Station Channel and Rossmoor Drain. Commingled river water and remediated water is proposed to be diverted from the American River at the Folsom South Canal and the City of Sacramento's Fairbairn Treatment Plant, and from the Sacramento River at the Freeport Regional Water Authority's Water Diversion Structure at Freeport. Water would be retained in the Sacramento Central Groundwater Basin area both by recharge or treated to potable standards for consumptive use. Some of the water is proposed to be used as a replacement water supply for SCWA, Golden States and Cal-Am lost supplies due to contaminated wells, and some is proposed to be used to supply new development within the water purveyors' service areas. The project would also provide 5,000 AFA of water to the Cosumnes River via the Folsom South Canal for environmental benefits, including improved salmon passage.

Contact Information

Name
Joyce Horizumi
Agency Name
Sacramento County Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Rancho Cordova
Counties
Sacramento
Cross Streets
Folsom Boulevard / Sunrise Boulevard
Parcel #
Various
State Highways
50
Railways
Regional Transit
Airports
Mather
Waterways
American & Consumnes Rvrs, Folsom S. Cnl, Alder, Morrison & Buffalo Crks, Boyd Stn &Cordova Chnl

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Caltrans, Division of Aeronautics, Department of Toxic Substances Control, Office of Historic Preservation, Resources Agency, Resources, Recycling and Recovery, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, Department of Water Resources
State Reviewing Agency Comments
Department of Water Resources
Development Types
Industrial , Water Facilities (Type pipelines, MGD 22,465)
Local Actions
Remediated Water Supply Project
Project Issues
Aesthetics, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Recreation, Transportation, Vegetation, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print