Main Avenue Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2004042120
Lead Agency
City of Sacramento
Document Title
Main Avenue Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2004
Present Land Use
Present use of the project area is existing public right-of-way (bridge structure)
Document Description
The proposed project consists of reconstructing Main Avenue Bridge (Bridge No. 24C-0008). Replacement of the bridge is proposed due to issues associated with structural deficiencies, including severe damage caused by timber decay and deterioration of the concrete deck. The proposed project consists of constructing a new four-lane bridge structure adjacent to and ultimately replacing the existing bridge. The proposed bridge structure will be approximately 821 feet long and approximately 80 feet wide. The proposed bridge will be elevated (grade-separated) and will span both the east levee for the NEMDC and the UPRR tracks. The new structure will accomodate four lanes of traffic and shoulders for standars bicycle lanes, as well as providing pedestrian and bicycle access.

Contact Information

Name
Scott Johnson
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Main Avenue between Northgate and Pell
State Highways
I-80
Railways
Union Pacific
Waterways
Steelhead Creek

Notice of Determination

Approving Agency
City of Sacramento, Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print