Proposed Site and Construction for a New Community Day School Site and Construction at 2120 2nd Street
2 Documents in Project
Summary
SCH Number
2004042108
Lead Agency
Oroville Union High School District
Document Title
Proposed Site and Construction for a New Community Day School Site and Construction at 2120 2nd Street
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2004
Present Land Use
The existing school site is a General Plan designation of Residential; the zoning is Residential Professional (RP) and Medium Density Multiple Family Residential (R-2M). School use is permitted in these zoning areas.
Document Description
The Oroville Union High School District has a need for a Community Day School. The District's existing continuation high school (Prospect Continuation High School) is across the street (Hammon Park Drive) from the proposed Community Day School and the proximity will be advantageous to students who may be attending classes at both locations. It is anticipated that this school will have an eventual student enrollment of 200.
Contact Information
Name
Susan Watts
Agency Name
Oroville Union High School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Oroville
Counties
Butte
Cross Streets
2120 2nd Street and Hammon Drive
Total Acres
1.89
Parcel #
031-150-057, -058
State Highways
CA 70
Railways
Yes
Waterways
Feather River (south and east), Thermalito Power Canal (North)
Township
19 N
Range
4 E
Section
12
Base
MDM
Notice of Determination
Approving Agency
Oroville Union High School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.