Sheldon Road Widening
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2004042069
- Lead Agency
- City of Elk Grove
- Document Title
- Sheldon Road Widening
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/26/2004
- Present Land Use
- Roadway adjacent to commercial, rural residential, medium-denisty residential, office/multi-family, and low-density residential.
- Document Description
- The project will widen Sheldon Road from the intersection of Bruceville Road to Lewis Stein Road (Segment 1), and again from Power Inn Road to Elk Grove-Florin Road (Segment 2). Segment 1 wil be widened to an interim four lanes (two through-lanes in each direction), with ultimate build-out being six lanes (three through-lanes in each direction). Segment 2 will be widening to four lanes (two through-lanes in each direction). The project would also include the installation of medians, turn lanes, and traffic signal improvements.
- Contact Information
-
Richard Galvin
City of Elk Grove
Lead/Public Agency
8400 Laguna Palms Way
Elk Grove, CA 95758
Phone : (916) 361-8384
Location
- Cities
- Elk Grove
- Counties
- Sacramento
- Cross Streets
- Bruceville Road to Lewis Stein Road (Seg. 1) and Power Inn Road to Elk Grove-Florin Road
- Total Acres
- 40 ESL
- State Highways
- SR-99
- Railways
- Union Pacific RR
- Schools
- Three Schools
- Waterways
- White House Creek
- Township
- 7 N
- Range
- 5 E
- Section
- 22, 27
Notice of Determination
- Approving Agency
- City of Elk Grove City Council
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of Elk Grove 8400 Laguna Palms Way Elk Grove, CA 95758
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.