Novato Creek Dredging Project
3 Documents in Project
Summary
SCH Number
2004042041
Lead Agency
Marin County
Document Title
Novato Creek Dredging Project
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2004
Present Land Use
County Flood Control Channel
Document Description
Removal of approximately 45,000 cubic yards of silt from the beds of Novato Creek, Warner Creek, and Arroyo Avichi Creek. This dredging is a routine maintenance for a designated flood control project. The site was most recently dredged in year 2000. The project area on Novato Creek will extend 5,630 feet from Diablo Avenue to 500 feet downstream of Northwestern Pacific Railroad Bridge, on Warner Creek the project area will extend 1,780 feet from Diablo Avenue to the confluence with Novato Creek, and on Arroyo Avichi it will extend 680 feet from South Novato Boulevard to the confluence with Novato Creek. The project area will be dewatered using three- coffer dams installed at the upper project limits on the downstream side of Diablo Avenue on Novato Creek and Warner Creek and at the downstream project limit 500 feet below the railroad bridge. Any flow from Novato Creek and Warner Creek will be diverted through existing pipes to the nearby Baccaglio Basin. Baccaglio Basin drains to Scottsdale Marsh, thence Scottsdale Pond, thence the Novato Creek marsh from which it can then re-enter Novato Creek downstream of the project area.
Contact Information
Name
Bill Cox
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Novato
Counties
Marin
Cross Streets
Diablo Avenue / Rowland Way
Zip
94945
Total Acres
8.35
Parcel #
140-061-03 et. al.
State Highways
101/37
Railways
NWPRR
Schools
Novato HS (1 of 12 schools)
Waterways
Novato Creek
Township
3 N
Range
6 W
Other Information
Section: Rancho San Jose
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.