Operation of Hi-Desert Water District Warren Valley Basin Groundwater Recharge
3 Documents in Project
Summary
SCH Number
2004041119
Lead Agency
Hi-Desert Water District
Document Title
Operation of Hi-Desert Water District Warren Valley Basin Groundwater Recharge
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2014
Present Land Use
Land Uses vary, but is primarily residential.
Document Description
The State Water Resources Control Board, Division of Drinking Water (hereinafter Division) as the responsible agency, will be issuing a water supply permit. The Hi-Desert Water District proposed project includes installing approximately 7,000 feet of 24-inch PVC pipeline. The maximum area of surface disturbance is estimated at 14,000 sq. ft. or approximately 3.21 acres. The project also involves construction of a recharge area containing two separate basins. Each basin will be approximately 5 acres in size. Other facilities include the flow control facility which will disturb another 3,000 sq. ft. or 0.07 of an acre of the recharge basin site surface, and approximately 555 cu. yds. of soil (to a 5 ft. depth). The 3 monitoring well and one extraction well will be developed according to typical District specifications.
Contact Information
Name
Sean McCarthy
Agency Name
State Water Resources Control Boards
Contact Types
Lead/Public Agency
Phone
Location
Cities
Yucca Valley
Counties
San Bernardino
Total Acres
15 +
State Highways
62
Township
1 N
Range
5 E
Section
Multi.
Base
SBBM
Other Information
The proposed project is located within the Town of Yucca Valley in the County of San Bernardino. The 24-inch pipeline will begin at the intersection of Sunnyslope Drive and Sage Avenue, head due west and then southwest to the intersection of Cholla Avenue and Buena Vista Drive, and generally parallel Buena Vista Drive until it intersects with Cherokee Trail, in Township 1 North, Range 5 east and Sections 34 and 35, San Bernardino Base & Meridian (SBBM). The proposed alignment follows the existing 16-inch Four Corners Petroleum pipeline route. The pipeline length is 7,000 feet. An approximate 10-acre recharge basin site is located just to the east of Pioneertown Road and south of Buena Vista Drive, to the southeast of quarter of Section 34, Township 1 North, Range 5 east, SBBM. The recharge site is located on land owned by the District, which already has other water facilities, including Wells #2, 3, and 9.
Notice of Determination
Approving Agency
State Water Resources Control Boards
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.